Sunday, December 25, 2011

Aim Environmental: Composting Facility for Green Bin Program


Welcome to the City of Hamilton Central Composting Facility operated by Aim Environmental Group. This facility was designed to process 60000 tons of source separated organic material per year by incorporating some of the worlds most innovative composting technologies. The design team at Maple Reinders, Aim Environmental Group and our partners at van Kaathoven Group and Christiaens Group collaborated to bring the finest in European, in-vessel tunnel technology to produce a system known for rapid decomposition of organic feedstock and the production of Ontarios highest grade compost. The material that is brought to our facility is inspected before being loaded into a shredder. The material is conveyed under a cross belt magnet to remove any metal contaminants before it is loaded into one of the ten Phase 1 tunnels. The shredded waste is distributed in uniform layers over the tunnel, which is equipped with a heating system, an aerated floor and a sprinkler system to nourish the microorganisms responsible for decomposing the organic matter. It will remain in the Phase 1 tunnel for 10-14 days. The material is then moved to one of six Phase 2 tunnels, where the material is further broken down and pasteurized in order to meet strict regulations. This second phase takes 7 to 10 days, and after cooling, the material is ready to be screened. The highly efficient screening plant is able to extract plastics, stones and other ferrous material from the compost in one pass. It also ...

Speck Video Order




No comments:

Post a Comment


Twitter Facebook Flickr RSS



Fran�ais Deutsch Italiano Portugu�s
Espa�ol ??? ??? ?????







Sponsor Links